Triple-A Team

Projects backup

  1. YUDP I  (1989 – 1992)
  2. YUDP II (1992 – 1995)
  3. YUDP III (1995 – 1997)
  4. YUIMS (1998-2001)
  5. YUDP AAA (2001 – 2003)
  6. USDRP (2003 – 2004)
  7. RDPRP (2003 – 2004)
  8. UAQ-i (2005-2006)
  9. EARTQUAKE JOGJA-JATENG (2006)
  10. LED-NTT (2004 – 2008)
  11. SPA (2007)
  12. ATAP (2007-2008)
  13. EDFF (2007-2008)
  14. WiSATA (2006 – 2008)
  15. BDRM (2009-2010)
  16. ADRM (2011)
  17. PEKA (2010-2012)
  18. NTT-DRM (2011)
  19. JCDS (2010-2012)
  20. ICWRMIP – RCMU (2012-2014)
  21. ICWRMIP – PFR II (2013-2014)
  22. NCICD – (2013)
  23. ICWRMIP – IME (2015)
  24. Update NCICD (2016)